FOR PROFESSIONALS

STREAMLINING STRUCTURES, REDUCING COST

Our specialist tender package review system finds meaningful cost and carbon savings in 85% of projects.

We built a system to help professionals unlock savings on construction projects. This system was developed iteratively by Re-Structured and utilises years of construction data and professional experience. The current version of the system is called Fortify and now finds meaningful cost and carbon savings in 85% of projects.


Fortify takes tender documentation and reviews it on behalf of the client. It assesses a host of variables such as material use, construction sequence, and document presentation. A key part of the system’s output is to do this without compromising design intent, compliance or safety.


Re-Structured works with firms to embed this system into their standard pre-construction protocols for every project, improving commercial margins and enhancing environmental performance.


This system is usually run between RIBA Stages 4 & 5 and is effective up to the point of ordering materials. It is used by Project Managers, Developers, Quantity Surveyors, Architects and Business Owners to analyse projects and quickly bring in savings to projects.


Fortify is a great way to bring another layer of value to clients. 

THE REAL COST OF OVER-DESIGN report

The latest insights from over 50 Tender Package reviews carried out using Fortify

Whilst refining Fortify, we undertook a meta-analysis of 50 tender packages. The results were not all obvious, so we prepared a report to share with the wider industry. The latest report covers:


  • Unlocking hidden savings – Discover how to reduce build costs by up to 3% without compromising quality.
  • Avoiding over-specification – Learn where structure is commonly over-designed and how to spot the warning signs.
  • Building smarter – Cut unnecessary materials, shorten programmes, and improve ROI on your next project.

DOWNLOAD THE REPORT: ENTER YOUR DETAILS BELOW

SUCCESS STORIES

Heath – £55k saved

£2m new-build with a basement and pool. We simplified the structure and sequencing to reduce materials and carbon without touching the design intent.


Saved 8+ tonnes of steel and 60 tonnes of concrete.

£55,000 saved.

Learn More

Frith – £88k saved

Vertical extension to add seven residential units above a shop and gym. Our review cut unnecessary steelwork and helped maintain live operations below.


17,000kg of steel removed.

£88,000 saved.

Learn More

Blackheath – £20k saved

Blackheath – £20k saved

Extra storey added to a block of flats. We helped the developer reduce steelwork and improve sequencing – while keeping the structure safe and buildable.


49% less steel. 33% less timber.
£20,000 saved.

Learn More

THE RE-STRUCTURED REVIEW PROCESS

After RIBA Stage 4, send the Tender Package to us

You find out if we can reduce construction cost and carbon

After RIBA Stage 4, send the Tender Package to us

Email the Tender Packages for each project to Re-Structured as they become available. Our system is effective at any time before materials are ordered.

Our specialist system analyses it

You find out if we can reduce construction cost and carbon

After RIBA Stage 4, send the Tender Package to us

Our system analyses the Tender Packages as they are received, against factors such as other similar projects, ground conditions, materials specified, and sequencing. On complex schemes, we feed in site constraints and buildability parameters for consideration.

You find out if we can reduce construction cost and carbon

You find out if we can reduce construction cost and carbon

You find out if we can reduce construction cost and carbon

We report back if our system is worth bolting onto the project – 85% of the time it is. We give guideline savings on cost and carbon savings for the project.

The Tender Package is optimised

You find out if we can reduce construction cost and carbon

You find out if we can reduce construction cost and carbon

If the project moves forward, we update the Tender Package to realise the savings without compromising design intent, compliance or safety. Another project optimised with reduced cost and carbon!

“They helped us unlock savings we didn’t know were possible – without holding up the programme.”


Development Manager, London

why partner with us?

improve your win rate

gain independent insight

improve your win rate

  Strengthen your bids by offering an enhanced Tendering process at no cost to you – demonstrate savings direct to the Client.

reduce resource spend

gain independent insight

improve your win rate

  We advise on what to specify and we draft the first response to Tenders received, so you don’t have to. 

gain independent insight

gain independent insight

Confidential Tender Package Review

  A second pair of eyes for your Tender Packages backed by current cost data and product insight empowering specifiers to optimise all future projects.

Confidential Tender Package Review

Confidential Tender Package Review

Confidential Tender Package Review

  You receive Fortify’s analysis on each project during the initial Tender Period. It will outline what savings can be made. Data stays private. 

Safe and compliant

Confidential Tender Package Review

No Redesign, no delays

A second pair of eyes for your tender packages backed by the latest cost data and insight.

No Redesign, no delays

Confidential Tender Package Review

No Redesign, no delays

  Fortify finds savings without compromising project aesthetic, performance or programme.

Partner with Re-Structured to realise cost and carbon savings on your projects

Get in touch