£5m mid-terraced refurbishment in London. The architect flagged a convoluted structure and called us in to simplify it.
45% less steel. 48% less timber.
Over £100,000 saved.
Vertical extension to add seven residential units above a shop and gym. Our review cut unnecessary steelwork and helped maintain live operations below.
17,000kg of steel removed.
Estimated saving: £88,000+.
£2m new-build with a basement and pool. We simplified the structure and sequencing to reduce materials and carbon without touching the design intent.
Saved 8+ tonnes of steel and 60 tonnes of concrete.
Homeowner saved £55,000.
£1.5m townhouse refurbishment. The client had been let down by a previous engineer. We stepped in to make the structure simpler and more cost-effective.
50% less steel.
Client saved £28,000.
Extra storey added to a block of flats. We helped the developer reduce steelwork and improve sequencing – while keeping the structure safe and buildable.
49% less steel. 33% less timber.
£20,000+ saved through redesign.
£100k ground floor extension. The homeowner was managing the build solo and didn’t want disruption — we helped simplify without changing the design.
39% steel reduction.
£3,000 saved in under a week.
© 2025 Re-Structured. All Rights Reserved.